Vidyasagar Setu

বিদ্যাসাগর সেতু

The cable-stayed Second Hooghly Bridge of 1992

Opened10 October 1992
TypeCable-stayed, six lanes
LengthAbout 823 m; main span 457 m
Also calledSecond Hooghly Bridge

Updated

Vidyasagar Setu, also called the Second Hooghly Bridge, is the cable-stayed toll bridge that links Howrah with Kolkata a few kilometres downstream of Howrah Bridge. When it opened on 10 October 1992 it was the first cable-stayed bridge in India and the longest of its kind in the country. Its fans of steel cables make it the most recognisable modern landmark on this stretch of the river.

A bridge twenty years in the making

The bridge was built to relieve the heavy traffic on Howrah Bridge, about 8 km upstream. Construction began in July 1979, but the project dragged on for around two decades, including roughly seven years in which no work was done at all. The final cost was about Rs 388 crore.

The bridge was designed by the engineering firm Schlaich Bergermann & Partner and built by the BBJ consortium for the Hooghly River Bridge Commissioners. It is named after Ishwar Chandra Vidyasagar, the 19th-century educationist and social reformer of the Bengal Renaissance.

Facts and figures

The bridge is about 823 m long with a main span of 457 m, almost the same as Howrah Bridge's main span, and is 35 m wide with six lanes. It carries the Kona Expressway (NH 117) and is a toll road.

Traffic grew slowly at first. A 2012 survey counted about 29,000 vehicles a day, far below the 85,000 once projected, but by 2018 traffic had reached roughly 90,000 vehicles a day. Toll collection was handed to a private operator in 2002.

Seeing the bridge

Most visitors see the bridge from the riverbank rather than crossing it. A popular viewpoint is the Kolkata bank around Princep Ghat, close to the eastern end of the bridge.

Princep Ghat station on the Kolkata Circular Railway is close to the eastern end, about 20 minutes by train from Howrah. Combine a visit with Howrah Bridge, about 8 km upstream, and the Botanic Garden at Shibpur on the Howrah side.

Vidyasagar Setu: questions

When was Vidyasagar Setu opened?

On 10 October 1992.

Who is Vidyasagar Setu named after?

Ishwar Chandra Vidyasagar, the 19th-century educator and social reformer.

How long is Vidyasagar Setu?

About 823 m in total, with a main span of 457 m and a width of 35 m.

Is Vidyasagar Setu a toll bridge?

Yes. Toll collection has been run by a private operator since 2002.