The Upper Dam and Lower Dam are the two reservoirs of the Purulia Pumped Storage Project in the Ajodhya Hills, and for most visitors they are the first stop on the plateau. The project, run by the West Bengal State Electricity Distribution Company (WBSEDCL), was India's first closed-loop pumped storage plant: the same water moves back and forth between a lake on the plateau and a lake below it, generating power when demand peaks.
How the project works
Both reservoirs are held back by rock-fill dams with a clay core. The upper lake sits at an elevation of roughly 494–516 m and the lower lake at about 300–337 m, so the water falls about 177 m through tunnels to an underground powerhouse with four reversible turbines of 225 MW each.
At times of peak demand, water runs down from the upper reservoir and the turbines generate electricity; the plant can start producing within minutes. When there is surplus power in the grid, the machines run in reverse as pumps and lift the water back up. Because no river flows through the system, it is called closed-loop.
Main works began in May 2002 and were completed in December 2007, with a loan from the Japan International Cooperation Agency (JICA) and a state government grant. The plant was formally inaugurated in April 2008.
Visiting the dams
The Upper Dam lies about 6 km and the Lower Dam about 9 km from the hill-top settlement, on the roads that run down the plateau towards Baghmundi. The lakes, with forested slopes rising behind them, are favourite places for sunset and photographs, and the drive between them shows the drop from the plateau to the plain.
These are working power installations: stay on the public roads and viewpoints, and follow any instructions from security staff. Carry your rubbish away; villagers have complained that plastic left by picnickers has harmed their cattle.
The dams are usually combined with Marble Lake, Bamni Falls and Turga Falls in a single day's drive around the hills.
Upper and Lower Dam (Purulia Pumped Storage Project): questions
What is the Purulia Pumped Storage Project?
A 900 MW hydroelectric plant in the Ajodhya Hills that moves water between an upper and a lower reservoir, generating power at peak times and pumping the water back up with surplus power.
When was the Purulia Pumped Storage Project built?
Main construction ran from May 2002 to December 2007, and the plant was inaugurated in April 2008.
How far is Upper Dam from Ajodhya hill top?
About 6 km; the Lower Dam is about 9 km from the hill-top settlement.
Why was the project controversial?
Local villagers say they lost forest and livelihoods and did not receive the benefits they expected; later pumped storage schemes in the hills, such as Turga, have been challenged in court.